This is an authentic sample of the 11-page technical report Beyond The Grid compiles following our 2-day on-site drone survey, soil pit analysis, and hydrological testing. Use the dropdown above or keyboard arrow keys to inspect each page.

SAMPLE
Beyond The Grid Off-Grid Development
Beyond the GridLand Viability Report
Sample report · For illustration only

Land Viability
Report

2.5-acre hillside plot, Lenggeng, Negeri Sembilan. Assessment of water, energy, food, access and cost for a permanently occupied off-grid household.

PREPARED BY
Beyond the Grid
REPORT REF
BTG-LVR-SAMPLE-01
SITE VISITS
2 · drone + soil pits
VERDICT
Viable with conditions
SAMPLE
01 · Summary & verdictLenggeng, Negeri Sembilan

Viable with conditions.

The plot can support a household year-round on its own water, power and a large share of its food. Three conditions must be met before committing to the build: a dry-season water yield test, a stabilised access track, and a slope-aware house pad on the upper terrace.

Beyond The Grid Off-Grid Development
Site walk, upper terrace, looking south-east toward the stream.
Beyond The Grid Off-Grid Development
Reference build: platform cut on comparable slope, month one.
What works
  • Perennial stream on the east boundary, 38 m above the house pad — gravity supply, no pump.
  • Open southern exposure; 4.1 kWh/m²/day mean solar resource.
  • Existing 2.8 km unsealed track to a tarred district road.
  • ~4,800 m² of deep, well-drained loam on the mid terrace.
Conditions
  • Confirm stream yield in the Feb–Mar dry spell (min. 2,000 L/day).
  • Regrade and drain the final 400 m of track before deliveries.
  • House pad cut kept under 1.2 m; gabion retaining.
  • Confirm residential use on pertanian title with the council.
Time to livable
5 months
Indicative budget
RM 200k
Solar array
5 kW
Water storage
10,000 L

Prepared by Beyond the Grid. SAMPLE REPORT — figures drawn from a real Beyond the Grid homestead build, simplified for illustration; a commissioned report is site-specific and more detailed. © Beyond the Grid. Not to be reproduced or redistributed without written permission. · Page 2 of 11

SAMPLE
02 · Location, access & titleLenggeng, Negeri Sembilan

Forty minutes from town, one bad track from the road.

The plot sits on the forested hillside slopes (372 m) in Mukim Lenggeng, Seremban district, Negeri Sembilan. Kuala Lumpur is roughly 60 km north via Semenyih; clinic, hardware and wet market are in Lenggeng town, about 5 km by road.

Locality map
Regional map
Locality: Mukim Lenggeng, Negeri Sembilan, with the sample plot (dashed) on the forested hillside and stream intake. Inset: Lenggeng between Semenyih, Mantin and Seremban. Map data © OpenStreetMap contributors. Plot outline is illustrative.
Site facts
Area2.5 acres (1.01 ha), irregular Elevation310–352 m above sea level TitleIndividual freehold, category pertanian. Residential use needs council confirmation. GridNearest TNB pole 1.9 km — connection uneconomic Mobile4G, 2 bars at ridge; nil in the valley Access2.8 km unsealed track; last 400 m rutted, 4WD only in rain NeighboursSmallholder durian to the north; state forest reserve beyond the stream
lvr-access-1
Track entrance: gravel wearing course laid on the first stretch off the district road.
lvr-access-2
Twin culverts at the stream crossing — the cross-drains the final 400 m still needs.
lvr-access-3
Machinery reached the boundary in dry conditions; the same track is impassable to lorries in heavy rain.
Access assessment

A 3-tonne lorry reached the boundary in dry conditions. Monsoon delivery (Nov–Jan) is unreliable without regrading the final 400 m, two cross-drains and a gravel wearing course. Budgeted RM 9,000–12,000 and treated as a precondition of the build.

Prepared by Beyond the Grid. SAMPLE REPORT — figures drawn from a real Beyond the Grid homestead build, simplified for illustration; a commissioned report is site-specific and more detailed. © Beyond the Grid. Not to be reproduced or redistributed without written permission. · Page 3 of 11

SAMPLE
03 · Site planLenggeng, Negeri Sembilan

Where everything goes, and why.

Schematic layout on the drone-derived contours. House and array sit on the upper terrace for drainage, sun and breeze; growing on the mid terrace; the lower bench and a 20 m stream buffer are left unbuilt.

350 m335 m320 m312 m STREAM — RIPARIAN BUFFER 20 m ACCESS TRACK 2.8 km HOUSE PAD 342 m · 8–12° 5 kW ARRAY 2 × 5,000 L INTAKE 352 m GROWING TERRACE · 4,800 m² beds · poultry · staples · 4–7° POULTRY ORCHARD & GOATS · lower bench 18–26° no structures · flood mark 1.4 m N 40 m
House pad, 342 m
5 kW ground array
Tanks, intake & HDPE line
Growing terrace, 4,800 m²
Orchard & goats
Access track
Title boundary (dashed)
Contours, 5 m

Prepared by Beyond the Grid. SAMPLE REPORT — figures drawn from a real Beyond the Grid homestead build, simplified for illustration; a commissioned report is site-specific and more detailed. © Beyond the Grid. Not to be reproduced or redistributed without written permission. · Page 4 of 11

SAMPLE
04 · Homestead layoutLenggeng, Negeri Sembilan

The compound: what goes where, and why.

Upper-terrace compound, ~1,800 m² inside the fence. Everything that uses water sits below the tanks; everything that makes noise or smell sits downwind and downslope of the verandah. Sample layout for a family of four, 90 m² house.

345 m338 m FALL TURNING+ LORRY DROP FROM TRACK BEDROOM 13.5 × 3.5 BEDROOM 23.5 × 3.5 KITCHENgas + wood BATH / WC PANTRY &COLD STORE LIVING · OPEN TO VERANDAH6 × 4.5 · cross-ventilated VERANDAH · SOUTH · 2.5 m deep overhang HOUSE · 90 m² · steel frame on pad footings · roof falls to tanks UTILITYCOREbattery · invertertools · store GEN 5 kW ARRAY · 9 × 550 W · faces south · 10° tilt 5,000 L5,000 L SAND FILTER RAIN +STREAM IN FROM INTAKE ↑ 352 m BANANACIRCLE greywater SEPTIC downslope of house · 30 m from stream KITCHEN GARDEN16 raised beds · 10 m from kitchen door HEN HOUSE20 layers · 25 meat birds RUN · rotated onto beds COMPOST WORKSHOP+ drying rack ELECTRIC FENCE LINE · boar & macaque N 10 m
House

Long axis east–west, verandah south for shade and monsoon breeze; bedrooms on the cooler east end.

Tanks & filter

West of house, 2 m above floor level so kitchen and bath run on gravity alone.

Array & utility core

Array on open ground north-east, 8 m from the battery room to keep cable runs short and heat out of the house.

Kitchen garden

Within 10 m of the kitchen door — the beds you see get weeded. Hens rotate onto them between crops.

Septic & banana circle

Downslope of the house, 30 m from the stream; greywater feeds the bananas, blackwater to septic.

Turning & drop

Gravelled circle sized for a 3-tonne lorry, so materials never get carried by hand uphill.

Prepared by Beyond the Grid. SAMPLE REPORT — figures drawn from a real Beyond the Grid homestead build, simplified for illustration; a commissioned report is site-specific and more detailed. © Beyond the Grid. Not to be reproduced or redistributed without written permission. · Page 5 of 11

SAMPLE
05 · Topography & drone surveyLenggeng, Negeri Sembilan

Three terraces, one buildable.

A 62-image drone survey at 80 m produced a 4 cm/pixel orthomosaic and elevation model, summarised here as a section and slope-class map. The plot falls 42 m from the north-west corner to the stream in three distinct benches.

352 m340328316310 HOUSE ARRAY TANKS BEDS · POULTRY ORCHARD STREAM UPPER TERRACE 8–12° MID TERRACE 4–7° LOWER BENCH 18–26° NWSESECTION A–A · length 190 m · vertical ×2
Schematic cross-section NW–SE from the drone elevation model (not to scale). Orthomosaic and DEM are supplied with a commissioned report.
UPPER · 8–12° · BUILDMID · 4–7° · GROWLOWER · 18–26° · RETAIN STREAM N SLOPE CLASS FROM 4 cm/px DEM · 2.5 ac · 1.01 ha
Slope classes: green <12° buildable, lime 4–7° growing, amber >18° retain under cover.
Beyond The Grid Off-Grid Development
Upper terrace: proposed house pad.
Beyond The Grid Off-Grid Development
Mid terrace: growing ground.
Beyond The Grid Off-Grid Development
Lower bench to the stream.
Upper terrace
8–12° slope

House pad. Stable residual soil, 340–352 m, morning sun, ridge breeze. Cut under 1.2 m.

Mid terrace
4–7° slope

Best ground, ~4,800 m². Deep loam, gentle fall. Beds, poultry, staples.

Lower bench
18–26° slope

Riparian strip. No building or clearing; fruit trees and buffer. Flood mark 1.4 m above bed.

Prepared by Beyond the Grid. SAMPLE REPORT — figures drawn from a real Beyond the Grid homestead build, simplified for illustration; a commissioned report is site-specific and more detailed. © Beyond the Grid. Not to be reproduced or redistributed without written permission. · Page 6 of 11

SAMPLE
06 · Water sources & yieldLenggeng, Negeri Sembilan

Gravity does the work. The dry season sets the limit.

The east-boundary stream was flowing at roughly 9,000 L/day at the wet-season visit. Intake at 352 m and house pad at 314 m gives 38 m of head — about 3.7 bar at the tap with no pump.

Beyond The Grid Off-Grid Development
Proposed intake, 352 m.
Pipe route to settlement tank under construction
Pipe route to settlement tank.
Reference dual 5,000 L storage tanks and filtration system
Reference build: 2 × 5,000 L storage.
Daily demand vs supply
Household (4 people)
800 L Poultry & goats
350 L Irrigation, dry spell
2,200 L Total demand
3,350 L Stream, wet season
~9,000 L Stream, dry season
TBD — Field Test

Dry-season flow is the one unknown that decides whether irrigation is cut back. A February bucket test is the first condition of this verdict.

Proposed system
  1. Screened intake box in stream, 352 m.
  2. 250 m of 50 mm HDPE to a 2,000 L settlement tank.
  3. Slow sand filter, then 2 × 5,000 L storage (10,000 L ≈ 3 days).
  4. UV at the kitchen tap only; greywater to banana circle.
  5. Rain catchment from 90 m² roof as second source (~150,000 L/yr).
Water system, indicative
RM 18,000–24,000

Prepared by Beyond the Grid. SAMPLE REPORT — figures drawn from a real Beyond the Grid homestead build, simplified for illustration; a commissioned report is site-specific and more detailed. © Beyond the Grid. Not to be reproduced or redistributed without written permission. · Page 7 of 11

SAMPLE
07 · Solar resource & energy sizingLenggeng, Negeri Sembilan

Sized for the worst monsoon week, not the best day.

The upper terrace has an unobstructed southern horizon; ridge trees to the north-east shade the pad before 8 am only. Mean solar resource is 4.1 kWh/m²/day, dropping to about 2.6 in the wettest weeks of December.

Beyond The Grid Off-Grid Development
Reference build: 5 kW ground-mounted array at 10° tilt.
Reference build 10 kWh LiFePO4 battery rack and 5 kVA hybrid inverter
Reference build: 10 kWh LiFePO₄ and 5 kVA hybrid inverter.
Load model (daily)
Fridge-freezer, inverter type1.1 kWh Lighting, LED throughout0.4 kWh Water pressure & UV (no lift pump)0.2 kWh Laptops, phones, router0.9 kWh Washing machine, 3×/week0.3 kWh Fans × 3, workshop tools1.6 kWh Design load4.5 kWh

No electric cooking, air-conditioning or electric water heating. Those three decisions halve the system cost.

Recommended system
Array
5 kW
9 × 550 W, ground, 10° tilt
Battery
10 kWh
LiFePO₄, 2 days autonomy
Inverter
5 kVA
48 V hybrid, genset input
Backup
3 kVA
Petrol genset, ~30 hrs/yr

Worst-week yield of ~13 kWh/day still covers the 4.5 kWh load with battery-recovery margin. Indicative cost RM 38,000–46,000 installed.

Prepared by Beyond the Grid. SAMPLE REPORT — figures drawn from a real Beyond the Grid homestead build, simplified for illustration; a commissioned report is site-specific and more detailed. © Beyond the Grid. Not to be reproduced or redistributed without written permission. · Page 8 of 11

SAMPLE
08 · Soil & food productionLenggeng, Negeri Sembilan

Eighty percent of vegetables, all of the meat.

Four hand-auger pits on the mid terrace found 60–90 cm of dark loam over clay, pH 5.8–6.2. Slightly acidic, well drained, low in phosphorus — typical hillside soil that responds fast to compost and rock phosphate. At 2.5 acres there is room for goats and an orchard as well as beds and birds.

Soil test pit 2 showing 80 cm deep organic loam profile with measuring tape
Soil pit 2, mid terrace: 80 cm loam.
Beyond The Grid Off-Grid Development
Reference build: raised beds, month 3.
Beyond The Grid Off-Grid Development
Reference build: 20 layers on rotation.
Beyond The Grid Off-Grid Development
Lower bench: orchard ground.
Production plan, in payback order
Month 1–2

20 laying hens, 16 raised beds (kangkung, bayam, sawi, chilli, long bean). First eggs and greens inside 8 weeks.

Month 3–6

Meat birds in rotation (25 every 10 weeks), papaya, banana circle on greywater, tapioca and sweet potato as staples.

Year 1–3

Orchard on the lower bench (durian, rambutan, jackfruit, lime), 6 goats on the rough slope, tilapia in the settlement-pond overflow.

Veg self-sufficiency
~80%
Meat & eggs
100%
Growing area
4,800 m²

Prepared by Beyond the Grid. SAMPLE REPORT — figures drawn from a real Beyond the Grid homestead build, simplified for illustration; a commissioned report is site-specific and more detailed. © Beyond the Grid. Not to be reproduced or redistributed without written permission. · Page 9 of 11

SAMPLE
09 · Risks & indicative budgetLenggeng, Negeri Sembilan

What could go wrong, and what it costs to do right.

Risk
Finding
Rating
Mitigation
Flood
Flood mark 1.4 m above stream bed; lower bench inundates yearly.
LOW
House pad 38 m above stream. Nothing structural on the lower bench.
Slope failure
Residual granite soil; two small historic slips on the 20°+ bench.
MEDIUM
Cut under 1.2 m, gabions, no clearing below mid terrace, drains before earthworks.
Water shortfall
Dry-season stream flow unmeasured.
MEDIUM
Feb–Mar yield test before purchase; roof catchment as second source.
Wildlife
Wild boar and macaque sign on the mid terrace; elephant nil.
MEDIUM
Electric fence on the growing terrace; dogs; harvest timing.
Legal / title
Pertanian category; dwelling permitted with conditions in this district.
MEDIUM
Written council confirmation before purchase; keep a farm-use component.
Access in monsoon
Final 400 m impassable to lorries in heavy rain.
HIGH
Regrade, cross-drains and gravel before the build starts. Non-negotiable.
Indicative build budget, excluding land
Access track & earthworks
RM 26,000Steel-frame house, 90 m²
RM 78,000Water system
RM 21,000Solar & battery
RM 42,000Poultry, fencing, beds, tools
RM 14,000Sanitation, greywater
RM 9,000Contingency 5%
RM 10,000 TotalRM 200,000
Beyond The Grid Off-Grid Development
Reference build at month five, RM 200k excluding land.

Prepared by Beyond the Grid. SAMPLE REPORT — figures drawn from a real Beyond the Grid homestead build, simplified for illustration; a commissioned report is site-specific and more detailed. © Beyond the Grid. Not to be reproduced or redistributed without written permission. · Page 10 of 11

SAMPLE
10 · Scorecard & recommended next stepsLenggeng, Negeri Sembilan

Overall: 3.9 / 5 — buy on conditions.

Water3/5

Excellent head and quality; dry-season yield unproven.

Energy5/5

Clear southern sky, cheap gravity water frees the load.

Food4/5

Deep loam, 4,800 m² workable; wildlife pressure.

Access2/5

Track needs RM 10k before anything moves.

Build ground4/5

Upper terrace stable; slope discipline required.

Legal3/5

Title category workable with council letter.

Risk4/5

No high-consequence risk once access is fixed.

Cost4/5

Within RM 200k envelope, land excluded.

Before purchase
  1. Bucket-test stream flow across 5 days in Feb–Mar.
  2. Written confirmation from Majlis on dwelling on pertanian title.
  3. Land search and boundary re-peg by licensed surveyor.
  4. Negotiate price against the RM 10k access cost.
First 90 days after purchase
  1. Track regrade, drains and gravel.
  2. House pad cut, surface drains, gabions.
  3. Intake, pipeline and tanks — water before power.
  4. Steel frame up; first 16 beds and 20 hens.
Beyond The Grid Off-Grid Development
What follows: full systems design.
Beyond The Grid Off-Grid Development
Build support on site.
Beyond The Grid Off-Grid Development
Handover with manuals.
Prepared by Beyond the Grid · Intellectual property

This sample report, including its method, layouts, drawings, scoring framework and text, is the intellectual property of Beyond the Grid and is protected by copyright. It is supplied free for personal reference only. No part may be copied, adapted, republished or used to prepare a report for a third party without written permission. A commissioned Land Viability Report covers your plot with our own drone survey, soil pits, flow tests and title search, and is typically more detailed than this sample.

Beyond the Grid

Prepared by Beyond the Grid. SAMPLE REPORT — figures drawn from a real Beyond the Grid homestead build, simplified for illustration; a commissioned report is site-specific and more detailed. © Beyond the Grid. Not to be reproduced or redistributed without written permission. · Page 11 of 11

Commission Your Assessment

Need an objective feasibility study for your land?

Our multidisciplinary engineering team—including CAAM-certified commercial remote pilots, hydrologists, and agroforestry designers—provides comprehensive on-site analysis before you commit to land purchase or contractor contracts.

Book a Feasibility Consultation → Review Our 6-Phase Process